01 / Story

The scene

A modern high-voltage research institution must serve changing needs. In Switzerland, FKH commissioned a modular HAEFELY impulse generator that could support different testing arrangements. The customer’s own reports record a factory acceptance test in June 2023 and an acceptance on site in September 2023, establishing a much more precise history than a generic equipment listing.

02 / Story

The engineering challenge

The generator’s full system rating is 1.8 MV and 180 kJ. But a later report shows a 12-stage configuration inside the new hall — not the entire nominal stage complement. It is tempting to attach the highest possible number to every photograph. Doing so would confuse the configuration captured on a particular day with the machine’s complete rated capacity. The distinction between how a system is designed and how it is deployed is central to this story.

03 / Story

Why it matters

The broader theme is flexibility. Unlike the giant fixed impulse towers, a modular system can move between different test geometries, and FKH’s records document both delivery and subsequent adaptation. It belongs alongside the older mobile cable testing story as evidence that high-voltage engineering is about moving or reconfiguring equipment to fit a real problem.

Evidence / What the documents actually establish

Sources, scope and limits.

FKH customer annual reports for 2023 and 2024 distinguish factory, site acceptance and hall configuration.

  1. FKH 2023 original annual report pp.31-33 new modular 1.8MV 180kJ HaefelyS-E2-002 · corporate_publication · original_annual_report_pdf_pages_31_32_visually_inspected
  2. FKH 2024 original annual report p.40 indoor 12-stage Haefely generatorS-E2-003 · corporate_publication · original_annual_report_pdf_page_40_visually_inspected

Visual quotations document individual historical points with named sources and creators; they are not a general image-library licence. Equipment claims are intentionally narrower than the surrounding institution’s activities.